Providing a Property Site Sketch
UPPCO wants to make applying for new electric service an easy and hassle-free experience for you. One of the most critical pieces of information we need to have, within 3 business days of applying for new service is a completed Property Site Sketch and Liability Waiver form. It is important to note that work will not proceed on your service installation until a completed form is received by UPPCO.
The Property Site Sketch and Liability Waiver must contain a variety of information, including:
- Signature of the property owner or the authorized representative.
- Customer name, service address, city, state, ZIP code and phone number.
- Name of road the building front faces and nearest crossroad.
- Building site dimensions in feet.
- Footage building is set back from road and lot lines.
- Footprint of structure.
- North orientation.
- Septic tank with primary and alternate drain fields (private sanitary system).
- Private well and service lateral to the building.
- Municipal water and sewer lines on the sketch.
- Location of porches, patios and decks.
- Location of all underground facilities, including, but not limited to: fuel runs, electric wires, communication wires, waterlines and other.
- Future plans for additions, decks or out-buildings.
- Preferred electric (E) meter location, including distance from closest corner. The meter spot on the sketch must be in compliance with all applicable codes and standards. (Please note: UPPCO cannot always guarantee your preferred meter location.)
Complete the Property Site Sketch and Liability Waiver form and return it to:
Upper Peninsula Power Company
P.O. Box 19001
Green Bay, WI 54307-9001
Fax: 866-430-6021
E-mail: newserviceinstallation@wisconsinpublicservice.com