Hydroelectric Project Data
The following data is updated every 10 minutes. Additional data is available on the WPS hydroelectric project data website.
Water Levels
2/4/2012 12:00:04 AM CST
| Dead River |
4-Hour Change |
| Silver Lake |
| Head Water Level |
1,476.0 |
feet |
0.0
|
| Tail Water Level |
1,457.4 |
feet |
0.0
|
| Hoist |
| Head Water Level |
1,337.8 |
feet |
0.0
|
| Tail Water Level |
1,201.0 |
feet |
0.0
|
| Total Flow |
124 |
cfs |
0
|
| McClure |
| Head Water Level |
1,196.1 |
feet |
0.0
|
| Total Flow |
107 |
cfs |
0
|
| Ontonagon River |
4-Hour Change |
| Bond Falls |
| Head Water Level |
1,460.8 |
feet |
0.0
|
| Victoria |
| Head Water Level |
894.5 |
feet |
0.0
|
| Tail Water Level |
692.8 |
feet |
0.0
|
| Total Flow |
234 |
cfs |
-2
|
| Sturgeon River |
4-Hour Change |
| Prickett |
| Head Water Level |
764.5 |
feet |
0.0
|
| Tail Water Level |
713.5 |
feet |
0.0
|
| Total Flow |
215 |
cfs |
+1
|
| Escanaba River |
4-Hour Change |
| Boney Falls |
| Head Water Level |
901.6 |
feet |
0.0
|
| Tail Water Level |
810.0 |
feet |
0.0
|
| Total Flow |
204 |
cfs |
-2
|
| Dam 3 |
| Head Water Level |
665.6 |
feet |
0.0
|
| Tail Water Level |
637.8 |
feet |
0.0
|
| Total Flow |
264 |
cfs |
+2
|
| Dam 1 |
| Head Water Level |
604.1 |
feet |
-0.1
|
| Tail Water Level |
578.9 |
feet |
-0.1
|
| Total Flow |
291 |
cfs |
-35
|
Data courtesy of Energy Supply and Control
UPPCO
is displaying this data for informational purposes only and provides no guarantee of
its accuracy or the frequency of updates.