|
Home >
Customer Service >
I'm Building >
Forms & Reference >
Providing a Property Site Sketch and Liability Waiver
Upper Peninsula Power Company wants to make applying for new electric service
an easy and hassle-free experience for you. One of the most critical pieces of
information we need to have, within seven (7) calendar days of applying for new
service, is a completed Property Site Sketch and
Liability Waiver form [PDF: 128KB / 2 pages]. It is
important to note that work will not proceed on your service installation until
a completed form is received and on file at UPPCO.
The Property Site Sketch and Liability Waiver must contain a variety of information, including:
- Signature of the property owner or the authorized representative
- Customer name, service address, city, state, zip code and phone number
- Name of road the building front faces and nearest crossroad
- Building site dimensions in feet
- Footage building is set-back from road and lot lines
- Footprint of structure
- North orientation
- Septic tank with primary and alternate drain fields (private sanitary system)
- Private well and service lateral to the building
- Municipal water and sewer lines on the sketch
- Location of porches, patios and decks
- Location of all underground facilities including, but not limited to: fuel runs, electric wires, communication wires, waterlines and other
- Future plans for additions, decks or out-buildings
- Preferred electric (E) meter location, including distance from closest corner. Meter spot on the sketch must be in compliance with all applicable codes and standards. (Please note: UPPCO cannot always guarantee your preferred meter location.)
You may request a Property Site Sketch and
Liability Waiver form [PDF: 128KB / 2 pages] by calling 1-800-242-9772.
|