Upper Peninsula Power Company
Contact Us

Upper Peninsula Power Company

Providing a Property Site Sketch and Liability Waiver

Upper Peninsula Power Company wants to make applying for new electric service an easy and hassle-free experience for you. One of the most critical pieces of information we need to have, within seven (7) calendar days of applying for new service, is a completed Property Site Sketch and Liability Waiver form [PDF: 128KB / 2 pages]. It is important to note that work will not proceed on your service installation until a completed form is received and on file at UPPCO.

The Property Site Sketch and Liability Waiver must contain a variety of information, including:

  • Signature of the property owner or the authorized representative
     
  • Customer name, service address, city, state, zip code and phone number
     
  • Name of road the building front faces and nearest crossroad
     
  • Building site dimensions in feet
     
  • Footage building is set-back from road and lot lines
     
  • Footprint of structure
     
  • North orientation
     
  • Septic tank with primary and alternate drain fields (private sanitary system)
     
  • Private well and service lateral to the building
     
  • Municipal water and sewer lines on the sketch
     
  • Location of porches, patios and decks
     
  • Location of all underground facilities including, but not limited to: fuel runs, electric wires, communication wires, waterlines and other
     
  • Future plans for additions, decks or out-buildings
     
  • Preferred electric (E) meter location, including distance from closest corner. Meter spot on the sketch must be in compliance with all applicable codes and standards. (Please note: UPPCO cannot always guarantee your preferred meter location.)

You may request a Property Site Sketch and Liability Waiver form [PDF: 128KB / 2 pages] by calling 1-800-242-9772.

| Contact Us | Search | Parent Company |

© Copyright 1996-2008 Upper Peninsula Power Company. All Rights Reserved.