Before service can be installed, the following conditions need to be met:

  • A site sketch or survey map must be sent to Upper Peninsula Power Company.
  • The construction site and building foundation must be back-filled to within 4" of final grade.
  • The service route is to be cleared 10' wide of brush, etc.
  • The electric meter base must be installed.
  • An Electrical Inspection Report needs to be received from the electrician or electrical inspector.
  • Easements need to be signed and on file with Upper Peninsula Power Company.
  • In Michigan, all service construction charges equal to or greater than $25.00 are to be paid in advance.